[Q] S-Planner and Goole Calendar - Galaxy Note 3 Q&A, Help & Troubleshooting

On my Note 8, the S-Planner sync with my Google Calendar on my PC with no issues and visa versa.
On my Note 3, the S-Planner will not sync unless Google Calendar is also installed and active.
Why???
Is it the difference between 4.2 and 4.3, 4.4??
Is there anyway to just use the S-Planner and get it to sync with Note 8 and Desktop?
Thanks.

Related

[Q] S-Planner in Galaxy Note does not sync with Google Tasks

It's possible to sync tasks from Google with tasks in S-Planner ?
Thanks

[Q] S calendar not updating to Google calendar

With the new settings menu of 4.3, I can't find the default that will sync my S Calendar with Google calendar.
Google calendar does sync with my Note 3 but not the other way around.
No problem on my Note 8. running 4.2
How do I get the Note 3 to sync or should I just go to Google calendar all the way around?
Thanks

Galaxy S5 S PLANNER - Can't Disable?! Want to replace with Google Calendar

Hi All,
On my S3 I was able to disable S Planner and just use Google Calendar. HD Widgets would then launch Google Calendar rather than S Planner because that was the only calendar left on my phone after S Planner was disabled.
However on my new S5, there are two instances of S Planner in Application Manager and I can only disable one and not the other. HD Widgets keeps launching S Planner over Google Calendar because that's the "favourite" or "default" calendar.
Anyone successfully disable these built in apps on the S5?
Thanks.
Justin.

Cm11 Google Calendar sync problem

I am on a Samsung SPH-L720T (Galaxy s4) running twrp/cm11 nightly. Recently I noticed that my Google Calendar will no longer sync to the my device, and it is not even available under the options in the accounts control panel to check or uncheck sync calendar, it's not even there as an option. Gmail works but calendar doesn't. How do I fix this?
Thanks!
FYI reflashed and it works.

task manager with google calendar sync

Hello
For samsung note 3, as well as note 10.1 2014, is there a task manager or organizer which will sync with google calendar? I mean, I add a task, and it syncs to google calendar as an event?
Thanks

Categories